
Projects - Composite Building
Type: Structural Steelwork
Client: NA
Location: Oxford
Date: Jul 2023
This job consisted of a structural steel frame, cold rolled floor joists, cladding rails, stairs and galvanised fire escape bridges. This was a challenging job as the steel structure was installed over an existing building before the existing steel frame was tied in to the new one. As the fire escape bridges were to the rear of the building, they were assembled and lifted by crane over the structure into position.
DM Steelworks Ltd - Unit H - Braintree Industrial Estate - Braintree Road - Ruislip - Middlesex - HA4 0EJ
Tel: 020 8864 5364 - Fax: 020 8423 8887 - E-mail: sales@dmsteelworks.co.uk
Structural Steelwork - Mezzanines - Primary Steelwork - Secondary Steelwork - Stairs - Portal Frame Buildings - Trellis Frames
London - Surrey - Kent - Essex - Hertfordshire - Middlesex - Buckinghamshire - Berkshire - Thames Valley - South East
Tel: 020 8864 5364 - Fax: 020 8423 8887 - E-mail: sales@dmsteelworks.co.uk
Structural Steelwork - Mezzanines - Primary Steelwork - Secondary Steelwork - Stairs - Portal Frame Buildings - Trellis Frames
London - Surrey - Kent - Essex - Hertfordshire - Middlesex - Buckinghamshire - Berkshire - Thames Valley - South East










